Consulter notre FAQ
{"searchBar":{"inputPlaceholder":"Rechercher par mot-clé ou poser une question","searchBtn":"Rechercher","error":"Veuillez saisir un mot-clé pour effectuer une recherche"}}
Using PowerChute Network Shutdown in a redundant UPS Scenario
Issue:
The purpose of using Power Chute Network Shutdown with a redundant UPS configuration is to confirm that an event is occurring on all UPS before sending a shutdown signal to the connected servers.
Product Line:
Power Chute Network Shutdown
Environment:
All support OS
Cause:
Informational
Solution:
Information concerning configuring PCNS with redundant UPS can be found at this linkApplication Note #98
Published for:APC Algeria
Cela vous a-t-il été utile ?
En savoir plus
Gamme :
En savoir plus
Gamme :