Prefabricated IT Data Hall, 500kW, 97 Racks, Perimeter CW Cooling, Mod Distrib, 480V/60Hz

Prefabricated IT Data Hall, 500kW, 97 Racks, Perimeter CW Cooling, Mod Distrib, 480V/60Hz

  • Large, scalable prefabricated IT infrastructure comprised of multiple SmartShelter Modules ganged together to create a configurable design and complete d optimized...

  • Includes: User Manual

View Product Overview
PFMIEA500C2N097A Features
Prefabricated IT Data Hall, 500kW, 97 Racks, Perimeter CW Cooling, Mod Distrib, 480V/60Hz
Large, scalable prefabricated IT infrastructure comprised of multiple SmartShelter Modules ganged together to create a configurable design and complete d optimized for service providers and large enterprises
Includes: User Manual
  • Air Return System
    Centralized hot air return system for room and external air handling systems minimize obstruction of lighting into the aisle and provide cable access from within the contained aisle.
  • Integrates with StruxureWare Data Center Expert
    An IT-ready, scalable access monitoring system that collects, organizes, and distributes critical alerts, surveillance video and key information, providing a unified view of complex physical infrastructure environments from anywhere on the network
  • Integrates with StruxureWare Management applications
    Achieve integrated energy efficiency, predictive planning and real-time data center operations through the add-on StruxureWare Data Center Operation applications.
SmartShelter Data Hall Features & Benefits
Agility
Pre-engineered and Factory Assembled
Prefabricated Modules are designed and built to precise specifications in a controlled factory environment and utilize DCIM software which results in improved reliability and a more predictably performing data center.
Simple and Fast Deployment
Prefabricated Data Center Modules arrive on site ready to deploy which significantly reduces installation time and cost.
Cost Savings
Simple and Fast Deployment
Prefabricated Data Center Modules arrive on site ready to deploy which significantly reduces installation time and cost.
Predictable Cost and Performance
Pre-engineered designs and factory assembled and tested infrastructure dramatically reduce total the total project timeline and complexity. This minimizes construction cost overruns and changes to the original engineering design. The result is the cost you expected the performance you planned for.
Product Distribution
Canada, United States
Options

Back to top