Roll over image to zoom in
APC NetShelter Switched Rack PDU, 1U, 1PH, 2.3kW 230V 10A or 2.5kW 208V 12A, 8 C13 outlets, C14 cord
AP7920B
Ideal for colocation, large data center, or remote edge computing
On/off outlet switching enable users to reboot connected equipment remotely
Plan capacity & balance loads with +/- 5% metering accuracy (amps)
Environmental Data
Environmental Data
Carbon footprint (kg.eq.CO2 per CR, Total Life cycle)
916
Use Better
Packaging made with recycled cardboard
No
Use Again
Take-back
Yes
+ Lifecycle Services
ECO1PH1YAC02
ECO1PH1YWITEAC02
Environmental Data
Schneider Electric aims to achieve Net Zero status by 2050 through supply chain partnerships, lower impact materials, and circularity via our ongoing “Use Better, Use Longer, Use Again” campaign to extend product lifetimes and recyclability.
Need more information? Check our technical FAQs!
Easily find answers to the most frequently asked questions.