Power
Uninterruptible Power Supply (UPS)
Surge Protection and Power Conditioning
Cooling
Modular Access Floor
Containment and Air Distribution
Chillers
Close Coupled Air Conditioners
Room Air Conditioners
Security and Environmental Monitoring
Sensors / Cameras / Licenses / Accessories
Security and Environmental Appliances
Racks and Accessories
LCD Monitors and KVM Switches
Rack and Enclosure Accessories
Racks and Enclosures
Data Center Containment
Power Distribution
Row 3 Phase Power Distribution
Rack Power Distribution
Transfer Switches
Prefabricated Data Center Modules
Power Modules
IT Modules
DATA CENTER SOFTWARE
Monitoring & Control
Software Services
Modelling and Planning
Operations
Services
Plan
Install
Operate
Optimize
Renew
Product Based Services
View All Solutions
Business Solutions
Home Solutions
Get Support
Need Help? Start here
Product Documents & Software
Product Guides
Additional Links
Contact Us
Browse FAQs
Issue: How to begin to set-up the floor layout for an EcoAisle System.
Product line: EcoAisle.
Environment: All.
Cause: Install.
Resolution:
IMPORTANT: Before installing remaining components, make sure the height and depth extenders have been installed. See the manuals provided with each of these kits for instructions on how to install them.