浏览常见问题解答



How to configure the SRC 5,6,8 & 10 KVA UPS Models External Battery Packs using the LCD display
Example 2: If there are 16 pcs of 100 AH batteries in series(for 5 KVA), the total AH number is 100 AH x 16 pcs=1600 AH
HTTP/HTTPS Web Access does not work in v6.X.X firmware but works on v5.X.X in certain NMC2 configurations/environments
Devices with an embedded Network Management Card 2 include (but are not limited to): 2G Metered/Switched Rack PDUs (AP84XX, AP86XX, AP88XX, AP89XX), Certain Audio/Video Network Management Enabled products, Smart-UPS Online (SRT).
Smart-UPS SRC 5k, 6k, 8k and 10 KVA FAQ
Issue: SRC 5,6,8 and 10 KVA FAQ
PowerChute Business Edition 8.0.1 Agent cannot be scheduled to shutdown using the PowerChute Business Edition 8.5 Server and Console.
Scheduled shutdown is not supported on PCBE Server and Console 8.0.X with PCBE Agent version 8.5.X Solution:
PowerChute Network Shutdown lost communications or cannot establish communication with UPS.
14. If the ap9630, AP9631, AP9635, AP9537SUM is running firmware 6.8.X or the NMC is a ap9640, AP9641 verify that HTTP and or HTTPS has been enable.
Things To Consider When Upgrading or Downgrading a Network Management Card 2 (NMC2) Device between v5.X.X and v6.X.X
Devices utilizing the Rack PDU 2G app (rpdu2g), Smart UPS/Matrix application (sumx) and Symmetra Single Phase (sy) application only
Why is the Environment Tab missing from the web interface on my AP9631 NMC2 v5.X.X firmware?
Smart UPS and Matrix UPS - sumx APP Symmetra 3 phase - sy3p APP
PowerChute Business Edition version 9.1.x, v9.5 Agent - Potential Issues with Overlapping Scheduled Shutdowns
It is advisable not to schedule overlapping schedules with a higher priority schedule starting first if you have a UPS with both a MOG and SOGs.
Video: Power-Saving Display Mode on Back-UPS XS/RS "G" & "M" Series
The default behavior to keep the display active at all times.


结果 1 - 10 50

找不到您查找的内容?

请联系我们的客户团队,获取有关技术支持、投诉帮助等的信息。