Our Brands

PB Busway Tap Off Unit, 1x1 Pole, 3 Wire, 30A, Phase C, 1 Drop Cord, 3ft, L5-30

PBP4A11L530C

Recommended replacement(s)

PBP4A11L530C is replaced by:
arrow2_down

Specifications

Overview
PresentationFactory-assembled and tested, the tap off units house standard circuit breakers and a pre-terminated cord set. No tools required for installation on any iBusway for Data Center busway straight section.
Lead timeUsually Ships within 3 Weeks
Main
Main Output Voltage120 V
240 V
Physical
ColourBlack
Height12.01 in (30.5 cm)
Width9.02 in (22.9 cm)
Depth5.51 in (14 cm)
Net weight18.03 lb(US) (8.18 kg)
Mounting locationFront
Mounting preferenceNo preference
Mounting modeNot rack-mountable
Input
network frequency60 Hz
Output
Max current draw30 A
number of power socket outlets1 NEMA L5-30R
Power cable length3 ft (0.91 m)
Conformance
Product certificationscUL listed
CSA
UL listed
Environmental
Ambient air temperature for operation14…104 °F (-10…40 °C)
relative humidity0…95 %
Operating altitude0...10000 ft
Ambient air temperature for storage-22…158 °F (-30…70 °C)
storage Relative Humidity0…95 %
Storage altitude0…15000 ft (0.00…4572.00 m)
Packing Units
Unit Type of Package 1PCE
Number of Units in Package 11
Package 1 Height14.13 in (35.9 cm)
Package 1 Width14.13 in (35.9 cm)
Package 1 Length33.50 in (85.1 cm)
Package 1 Weight31.00 lb(US) (14.06 kg)
Contractual warranty
Warranty1 year (parts only)
arrow2_down

Sustainability

Green PremiumTM label is Schneider Electric’s commitment to delivering products with best-in-class environmental performance. Green Premium promises compliance with the latest regulations, transparency on environmental impacts, as well as circular and low-CO2 products.
Learn morearrow2_left

EU RoHS Directive

Under investigation

arrow2_down

Documents

arrow2_down

Software and Firmware

Need more information? Check our technical FAQs!

Easily find answers to the most frequently asked questions.