FAQs durchsuchen
{"searchBar":{"inputPlaceholder":"Nach Stichwort suchen oder Frage stellen","searchBtn":"Suchen","error":"Bitte geben Sie ein Stichwort für die Suche ein."}}
Using PowerChute Network Shutdown in a redundant UPS Scenario
Issue:
The purpose of using Power Chute Network Shutdown with a redundant UPS configuration is to confirm that an event is occurring on all UPS before sending a shutdown signal to the connected servers.
Product Line:
Power Chute Network Shutdown
Environment:
All support OS
Cause:
Informational
Solution:
Information concerning configuring PCNS with redundant UPS can be found at this linkApplication Note #98
War das hilfreich?
Weitere Produktinformationen
Bereich:
Weitere Produktinformationen
Bereich: