Browse FAQs



Smart-UPS VT-g3500; installation, recommended breaker and cable sizes
Smart-UPS VT-g3500; installation, recommended breaker and cable sizes ... Tower frame / all serial numbers ... Product installation, recommended breaker and cable sizes and external communications cables. ... Recommended Wire Size UPS/AWG size Mains input (AWG) AC output (AWG) DC input (AWG) 75 Degree C Wire ... 20kva 4 4 1 ... Recommended Cable Size and Lug Cable Size (AWG) Cable Lug Type Crimping Tool Die Terminal Bolt Diameter 12 YA12CL2TC38 MD7-34R W12CVT 0.2in/6mm ... 4 YA4CL2TC38 MD7-34R W4CVT 0.2in/6mm
Network Air FM unit spare parts list
... 1 1/ 4 "-12R ... ... heater [K 4 ]) ... .7 X 12 .8 X ... ... .7 X 12 .8 X ... FLOORSTAND 12 " FM35- ... ... -1/ 4 " H/ ... ... -3/ 4 " H/ ... Humidifier Frame 208-575V ... PLENUM , 20" ... PLENUM , 20" ... PLENUM , 20" ... PLENUM , 24" ... PLENUM , 24" ... PLENUM , 24" ... PLENUM , 24" ... Return/ Supply Temperature, Humidity ... ... SEISMIC FLOORSTAND, 12 " FM 35 ... ... /PCIOM/ Supply & Return Temp ...
acdc1010 Hot Aisle Containment Rack Expansion Bundle Kit Installation (Manual)
4 . Wear appropriate ... ... Door and Door Frame Removal The door frame is heavy and ... ... door and door frame . ... M6× 12 mm screws and ... remove the door frame assembly from the ... ... M6 × 12 -mm ... M6 × 12 -mm screw ... ... based on the size of the enclosures ... ... face the door frame ... from the panel frame ; remove the ... Door Frame and Door Installation ... attach the door frame to the end ... ... Attach the door frame assembly to the ... ... M6 × 12 -mm screws ... 3. Attach the plinth blocks to the enclosures, using four M8 × 25-mm screws
Refrigerant charging table for a Uniflair Unit
... table for a Uniflair Unit. Discharge Line Sizing ... lines must be sized such that refrigerant ... ... Total Discharge Line Size : • For pipes running in a downward vertical direction, select pipe size from the horizontal sizing table. Discharge Line Size —Vertical: ... Discharge Line Size —Horizontal ... Liquid Line Sizing : Liquid lines must be sized to ensure sufficient refrigerant flow to the expansion device and to minimize pressure drop. ... 4 . After 24 hours, verify that no drop in pressure has occurred. ... 4 . Wait for an hour and check vacuum level. ... 4 . Charge to 80% of the calculated total.
ACRP1XX, ACRD5XX, ACRP5XX, and ACRC5XX Parts List
... SHUTOFF 3/ 4 " [ ... - ACRP ADDITIONAL SUPPLY TEMPERATURE SENSOR ... FOR HOLE D 4 .8MM ROHS ... ... Overflow HOSE STEAM SUPPLY 7/8ID ... ... a pack of 4 filters FILTER AIR ... ... Piping Couplings ( 4 per pack) ... ... a pack of 4 with pn# ... ... 9897 HOSE STEAM SUPPLY 7/8ID ... (humidifier frame (humidifier frame ... -1/ 4 IN ... OD 1/ 4 ID (Internal ... ... OD 1/ 4 ID (Internal ... ... OD 1/ 4 ID (Humid
What is the maximum number of XR frames allowed with a Symmetra PX 20, 40 and 80kw solution?
... PX solution is 4 . ... depends on the size of the Symmetra PX Main Frame . ... 20 or 40kw Frame , the maximum number permitted is 4 fully populated ( ... ... fully populated XR frame is SYCFXR8- ... ... of the XR frame with 8 Batteries ... There are 4 Battery Units in ... equals an XR frame with 32 Battery ... ... Symmetra PX 80kw Frame , the maximum ... ... a total of 4 battery frames in ... the Main UPS frame which houses the ... ... populated 80kw XR frame is SYCF8BF- ... ... of the XR frame with 8 Batteries ...
Which hole plugs are needed when NetShelter doors are removed?
... to cover ( 12 ) holes created ... ... holes in the frame that the rear ... ... opening on the frame . ... please use ( 4 ) per cabinet ... ... holes in the frame . ... holes in the frame that the rear ... ... opening on the frame . ... to cover ( 4 ) holes created ... ... opening on the frame . ... holes in the frame . ... opening on the frame . ... holes in the frame that the rear ... ... opening on the frame . ... please use ( 4 ) per cabinet ... ... to cover ( 12 ) holes created ... holes in the frame . 827-0188 is used to cover the holes in the frame that the rear door rods would use.
Why is my actual UPS runtime different from the quoted runtime on the APC web page?
- In particular the actual size of the load compared with the theoretical load. ... So providing the storage period and temperature has not exceeded the typical battery manufactures specification the battery will return to near full capacity, but sufficient recharge time, 48 - 72 hours must be allowed for the capacity to be recovered. Typical maximum storage period is 12 months at 25 deg Celsius, 8 months at 30 deg Celsius and 4 months at 40 deg Celsius.
Video: How do I configure APC Network Management Card network settings?
DHCP Option 12 - (NMC2 ... ... (RJ- 12 to DB- ... (RJ- 12 to DB- ... ... (RJ- 12 to DB- ... ... Ping with a size of 113 bytes ... Configuration Option 4 - DHCP Option 12 (NMC2 devices ... ... has implemented Option 12 (Host Name ... DHCP option 12 uses the devices ... ... order for option 12 to work properly ... Some newer Smart-UPS models provide the capability to configure the Network Management Card 2 (NMC2) IP address, subnet mask, and gateway using the front panel LCD display menu.
How do I replace a single phase Symmetra power module?
8- 12 kva ... The fault and diagnostic menu will identify any failed power modules by their location (L1 - L 4 ). ... The bays are labeled L1 - L 4 (from top to bottom). ... When the screw is as loose as it can be, Pull the latch toward you and down into the frame .


Results 1 - 10 of 50

Can't find what you are looking for?

Reach out to our customer care team to receive information on technical support, assistance for complaints and more.