Browse FAQs



What are the requirements for the acsc100 condenser unit
wb, assuming 1440 m 3 /hr of 35C condenser inlet, while consuming 2.4kw of power.
Network Air FM unit spare parts list
CKT BKR 3 P 20a 480vac ... CKT BKR 3 P K 16A ... CKT BKR 3 P K 20a ... CKT BRKR 3 P 100a 600v ... CKT BRKR 3 P 150a 600v ... CKT BRKR 3 P 25A 480v ... CKT BRKR 3 P 30a 600v ... CKT BRKR 3 P 40a 480v ... CKT BRKR 3 P 40a 600v ... CKT BRKR 3 P 50a 600v ... CKT BRKR 3 P 60a 480v ... CKT BRKR 3 P 70a 600v ... ... FIX SOLUTION # 3 ... 24V 50/ 60hz - MKC- ... ... 24V 50/ 60hz - MKC- ... ... humidifier [K 3 ] & heater ...
What are the operational conditions for an InRoom (Stulz) Unit
Outdoor ambient conditions: Lower limit: -10°C (14°F) Upper limit: Depending on selected condenser ... 460v / 3ph / 60 Hz ... Voltage imbalance: < 3 % ... Maximum equivalent length of piping between the cooling unit and the air cooled condenser : 60 m (200 ft) Maximum level difference between the condenser and the cooling unit: 5 m (16 ft) when the condenser is below the cooling unit ... Data is valid for: 460v / 3ph /60 Hz
Uniflair Pump Packages Technical Specs
ACPP2324 Dual Pump Package 2 HP 460v / 3 /60 Hz, FlowRate 34 GPM
APC Schneider Cooling Unit Identification
... -230/ 3 /60 ... = 480/ 3 /60 ... = 600/ 3 /60 E ... A= 3 row 20 ... -230/ 3 /60 ... = 480/ 3 /60 ... = 600/ 3 /60 ... /208/ 3 /60 ... /208/ 3 /60 ... /480/ 3 /60 ... /208/ 3 /60 F ... ... = 600/ 3 /60 ... /208/ 3 /60 ... /208/ 3 /60 ... /480/ 3 /60 ... /208/ 3 /60 E ...
Information on Online and On Battery operation of 3:1 Symmetra UPS systems
The output voltage can be set 220 / 230 / 240 VAC. The output frequency can also be set to either 50hz or 60hz .
How to navigate through an Network Air FM unit display
Set the condenser fluid valve as a three -way valve.
DAC, Cancoil Installation Manual
Allow 3 feet of clearance on all sides of the condenser section and at least ... of clearance above the condenser section for proper airflow.
Can I connect the ACSC1XX condenser ducts to any drop ceiling?
Each SC unit needs 850 CFM (1440 m 3 /hr) of air supplied to, and removed from, the condenser . Please
How to read a pressure temperature chart for super-heat and sub-cooling calculations
PT charts are most often used for three purposes: to set a coil pressure ... saturated liquid condition at the end of the condenser .


Results 1 - 10 of 50

Can't find what you are looking for?

Reach out to our customer care team to receive information on technical support, assistance for complaints and more.